- Cathodic Protection Budget Evaluation: Preparation of Bid Documents such as technical specifications according to international standards, installation & commissioning procedures and drawings
- Cathodic Protection Bid Evaluation: All the relevant documentation in accordance to project specifications and international standards.
- Installation Drawings
- Prior installation inspection and commissioning procedures.
- We can provide a full technical review and evaluation of the tenderers for the end client ensuring most cost efficient option
Specifications, Procedures, Method Statements and Drawings
Engineering services provided by highly qualified professional and NACE corrosion engineers and technicians: